Everything below is transcribed directly from two real factory documents: the Nissan A12 & A15 Industrial Engine Service Manual (p.MA-2, “MAINTENANCE SCHEDULE”) for the engine, and the Grove Operators Safety and Maintenance Handbook (Section 4 “Pre-Starting Checks” and Section 5 “Lubrication Chart”) for the machine itself. Nothing here is a generic guess — where a figure isn’t confirmed by one of these documents, it’s left out rather than invented.

1. Every time before starting (daily, if in regular use)

From the Grove handbook’s PRE-STARTING CHECKS — do a complete walk-around first (structural damage, loose equipment, leaks, anything needing correction), then:

  • Engine oil level (dipstick, either before starting or 5+ min after a stop)
  • Engine coolant level (overflow tank)
  • Battery state-of-charge, cable/clamp condition (tight, not corroded)
  • Tires — cuts, embedded objects, correct inflation per decal
  • Hydraulic reservoir fluid level; filter condition indicator and breather clean/secure
  • Tilt alarm test (press one corner of the tilt sensor on the platform frame — buzzer should sound)
  • Control operation check — engine OFF, E-stop pulled out, ignition ON: verify APU switch and every platform-control switch/controller responds, then verify every ground-control switch
  • Turntable lock pin — stowed/removed for operation, installed for transport
  • Air cleaner — filter clean, tubing properly installed
  • Daily-interval lubrication points (see §3)
If the machine has sat idle: the handbook explicitly says — “Do not let the work platform remain idle for long periods of time. At least once a week, start the work platform engine and cycle all functions several times.” See the post-storage inspection for the catch-up this implies.

2. Nissan A15 engine schedule (from the factory manual, p.MA-2)

The manual specifies months or hundreds of hours, whichever comes first (e.g. “2” under hours = 200 hours). Reproduced faithfully below — for the exact cell-by-cell grid, the source page image is in the engine service manual, page 9.

OperationInterval
Retighten cylinder head bolts, manifold & exhaust tube nuts, carburetor attaching nutsOnce, at month 1 / 200 hrs (post-break-in retorque)
Adjust intake & exhaust valve clearanceEvery 3 months / 600 hrs
Check drive belts (cracks, fraying, wear, tension)Every month / 200 hrs
Change engine oilEvery month / 200 hrs
Replace engine oil filterApprox. every 3 months / 600 hrs
Change engine anti-freeze coolant (LLC/ethylene glycol)Annually / 2,400 hrs
Clean/replace air cleaner element (dry paper)Clean: monthly (skip months 6 & 12); Replace: every 6 months / 1,200 hrs
Check crankcase ventilation hoseAnnually / 2,400 hrs
Check & replace spark plugsCheck: every month; Replace: annually / 2,400 hrs
Check distributor point, cap, rotorEvery month / 200 hrs
Check ignition wiringAnnually / 2,400 hrs
Adjust ignition timingEvery month / 200 hrs — target 10° BTDC at idle (see Specs)
Adjust engine idle rpmEvery month / 200 hrs — target 650 rpm
Clean/replace fuel strainer, check fuel lines, clean radiator outside, check cooling hosesMarked “follow O.E.M. instructions” in the source table — no Grove/Nissan-specific interval given

Given this machine hasn’t been run in an unknown span of time, treat it as overdue on everything in this table rather than trying to figure out where in the cycle it last was — start the clock fresh from a full service once it’s running (see the startup procedure first).

3. Grove machine — lubrication chart (T60/MZ66 handbook, Section 5)

Daily

PointLube/checkAmount
Hydraulic reservoirCheck level; drain/fill as necessary through top of in-tank return filter30 gal (114 L) per Specs
Engine crankcaseCheck level
Engine coolantCheck levelAs required

Weekly

PointLubeNotes
Swing bearing raceGreaseUntil grease extrudes around full circumference
External gearBrush-on coatingCoat all teeth
Mid-section wear padsEP-MPG (standard) or Dri-Slide (hostile-environment models)Thoroughly coat wear pad surfaces on fly sides
Base section wear padsSame as aboveInside only
Boom telescope cylinder wear padsSame as aboveInside top/bottom of fly section
Boom mid-section top plate / fly section bottom plate / mid-section bottom platesSame as aboveWeekly brush-on

Monthly

PointLubeNotes
King pin bearingsEP-MPG greaseUntil grease extrudes, 1 fitting each bearing
Tie rods & end linksEP-MPG greaseUntil grease extrudes, 1 fitting each end
Steer cylinderEP-MPG greaseUntil grease extrudes, 1 fitting each end
Torque hubsEPGL-5 oilCheck monthly; initial oil change at 50 hrs, then every 1,000 hrs or 1 year, whichever first. Higher operating temps need more frequent changes. Fill to 1 in (2.54 cm) below hub centerline, 17 oz (0.51 L).
Oscillating axle pivot pinEP-MPG greaseUntil grease extrudes
Swing gear boxEPGL-5Monthly

Every 1,000 hours or annually (whichever first)

PointNotes
Non-drive wheel bearingsRemove dust cap/cotter pin/nut/bearing, repack with EP-MPG, reinstall. More often under severe conditions.

Every 6 months (or more often under severe conditions)

Point
Hydraulic return filter element — replace
Hydraulic pressure filter element — replace

Yearly

Point
Hydraulic motors — clean, fill system

4. Filter/fluid part numbers — confirmed, no serial lookup needed

These are transcribed from the MZ66B parts catalog’s own index (both the assembly listing and the alphabetical index cross-reference agree, p.139–267) with no serial-effectivity break noted for any of them — these are correct for this machine as-is, order with confidence:

ItemPart numberCatalog pageNotes
Filter assembly, oil return7437000112249
Filter assembly, hydraulic7437000740249
Filter, fuel7437000104139~$139 per catalog pricing seen
Element, pressure filter9437100642267~$267 per catalog pricing seen
Element, oil return9304100081265
Element, air cleaner9304100091147

For the engine itself (gaskets, bearings, rebuild kit — not covered by the Grove parts catalog since that’s Nissan’s own part), quote engine serial number 85029 when ordering from Grindstaff (816-796-7676) or any Nissan/TCM parts source — see Specs for the exact gasket set (10101-05H25) and main bearing set (12207-H1000) part numbers already confirmed.

5. Cross-references

  • Startup procedure — do this before starting engine maintenance-schedule work; several items above (adjusting idle/timing) require the engine running and warmed up.
  • Post-storage inspection — the inspection this machine actually needs given how long it’s sat, before trusting the “every month” cadence above.
  • Specs — bore/torque/valve-clearance specs referenced by the engine schedule above.
  • Research — sourcing and provenance for every manual referenced here.